beBee background
มืออาชีพ
>
Bangkok
Artith Wongpaun

Artith Wongpaun

Civil / Structural Engineer

วิศวกรรม / สถาปัตยกรรม

Bangkok, กรุงเทพฯ

สังคม


เกี่ยวกับ Artith Wongpaun:

Engineers are responsible for the lives of others. So, consider everything carefully.

ประสบการณ์

September 2019 – April 2021         Bridge Engineer, Civil and Structural Engineers co., ltd.

 

  • Double track railway construction, Prachuap Khiri Khan – Chumphon (Contract 2 Bang Saphan Noi – Chumpon)     ; Span 20 m of railway truss steel bridge

 

  • Formulated structural design and evaluation of steel bridge (Truss)
  • Analyzed bridge construction and check support during construction

 

  • Overpass, Leamchabang – Pranburi ; Balanced Cantilever Bridge Span 60+90+60 , Substructures 

 

  • Formulated substructure design and evaluation of balanced cantilever bridge.
  • Analyzed balanced cantilever bridge construction for construction state.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

  • Double track railway, Sriracha – Map  Ta Phut ; Balanced Cantilever Bridge Span 35+60+35 , Substructures

 

  • Formulated substructure design and evaluation of balanced cantilever bridge.
  • Analyzed balanced cantilever bridge construction for construction state.

Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

  • 3rd Outer Ring Road of Bangkok (East Side) ; Crossbeam for Road with (max) 23 m in Span (max) 40 m of           I-Girder bridge, Substructures 

 

  • Formulated substructure design and evaluation of bridge.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 


 

 


 

  • Overpass Junction Rural Road No. 201-205 and Country Road No.4008, Dan Khun Thot & Phra Thong Kham, Nakhon Ratchasima ; Crossbeam for Road with (max) 23 m in Span (max) 20 m of I-Girder bridge, Substructures and Balanced Cantilever Bridge Span 30+65+30 , Substructures and Segment Reinforcement.

 

  • Formulated substructure design and evaluation of other bridge.
  • Analyzed balanced cantilever bridge construction for construction state.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

  • Bypass Highway, Jom Thong, Chaing Mai ; Crossbeam for Road with (max) 23 m in Span (max) 40 m of I-Girder bridge, Substructures 

 

  • Formulated substructure design and evaluation of bridge.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

May 2021 – March 2022                  Bridge Engineer, Span Company Limited

 

  • Overpass Rural Road No.1006, Bang Sua Thong, Samut Prakan; Span (max) 40 m of Segment bridge, Longitudinal Prestressed Segment & Substructures

 

  • Formulated substructure design and evaluation of other bridge.
  • Analyzed Longitudinal Stress and Moment of bridge constructions for reinforcement with Prestressed Tendon and rebar of bridge constructions.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

  • Overpass Bang Sa Phan Lang Junction Rural Road No. 4045 and Road No.4, Bang Sa Phan, Prachuap Khiri Khan; Span (max) 40 m of Segment bridge, Longitudinal Prestressed Segment & Substructures

 

  • Formulated substructure design and evaluation of other bridge.
  • Analyzed Longitudinal Stress and Moment of bridge constructions for reinforcement with Prestressed Tendon and rebar of bridge constructions.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

 

  • Overpass Ban Chan Junction Rural Road No. 215 and Road No.2, Ban Chan, Udon Thani; Span (max) 40 m of Segment bridge, Longitudinal Prestressed Segment & Substructures and Ramp of U-Girder. 

 

  • Formulated substructure design and evaluation of other bridge.
  • Analyzed Longitudinal Stress and Moment of bridge constructions for reinforcement with Prestressed Tendon and rebar of bridge constructions.
  • Performing and checking bridge design calculation and plans for projects and preparing technical reports.

การศึกษา

2012 – 2016      King Mongkut’s University of Technology Thonburi

Bachelor of engineering (Civil Engineering)

Project: Effects of NaOH on Strength and Chloride Penetration of Concrete Made from the Mixture of Calcium Carbide Residue and Fly Ash.

 

2016 – 2019      King Mongkut’s University of Technology Thonburi

Master of engineering (Structural Engineering)

Thesis: A Study of Factors Affecting Compression Strength and Expansion due to Alkali-Silica Reaction of Fly Ash-Based Alkali Activated Mortar.

ผู้เชี่ยวชาญจากภาค วิศวกรรม / สถาปัตยกรรม เดียวกันกับ Artith Wongpaun

ผู้เชี่ยวชาญจากภาคต่างๆใกล้ Bangkok, กรุงเทพฯ

หางานใกล้ Bangkok, กรุงเทพฯ

  • MIDAS IT Din Daeng, Bangkok

    Structural Engineer (Structure Design) – Midas Gen Software · SKYY9 (ใกล้ MRT พระราม 9) · บริษัทเกาหลี – ธุรกิจ Software (วิศวกรรมโครงสร้าง / Structural Engineering) · ...

  • Structural Site Engineer

    1 สัปดาห์ที่แล้ว

    บริษัท ไมนฮาร์ท (ประเทศไทย) จำกัด เขตราชเทวี, กรุงเทพฯ

    Structural Site Engineer วางแผน กำกับ ควบคุม ดูแล และตรวจสอบงานก่อสร้าง ติดตั้ง ซ่อมแซม ดัดแปลง หรือรื้อถอน ให้กับเจ้าของโครงการ ตามวัตถุประสงค์และนโยบายของโครงการ ในด้านต่างๆ อันได้แก่ Time, Cost, Quality, Safety and Sustainability · Responsibilitiesวางแผน กำกับ ควบคุม ดูแล และ ...

  • Site Engineer

    1 เดือนที่แล้ว

    24 SOLUTION GROUP (THAILAND) CO., LTD. Bangkok

    ควบคุมงานก่อสร้างบ้านเดี่ยว การาจ และอาคารต่อเติมสูง 4-5 ชั้น ให้เป็นไปตามแบบแผน · ถอดแบบ-ถอดปริมาณงาน เพื่อจัดเตรียมวัสดุและควบคุมต้นทุน · วางแผนและจัดสรรทีมช่าง/ผู้รับเหมาตามสัดส่วนงาน พร้อมดีลกับผู้รับเหมา · , · , · ...