Has over 26 years of extensive Instrument Engineering Works, Construction works, Quality Construction Works, Mechanical Completion Works, SAT Loop test, Function Test, Pre-commissioning work, and Commissioning work experience and knowledge in diverse activities for Off-Shore, On Shore, Oil & Gas, Power Plant, Pharmaceutical Plant, and Petrochemical Plant, including the engineering design verification and reviews on Instrumentation Control System, DCS, PLC, SIS, ESD, F&G Systems, PAGA and SCADA systems, Field Instrument design, cause-effect (C&E), Instrument Datasheet, Instrument Process Hook-up, and Typical Installation Details and, Material Take Off, RFQ and Technical Bid Evaluation (TBE)

                                                                                                    

Engineering Work such as developing design work as a minimum with the following, specifications, requisition, datasheets, hook-up drawings, loop drawing, block diagrams, instrument list, I/O list and etc. and to ensure that all related deliverables are in compliance with the applicable codes, standards, project, and corporate requirements and procedures. Coordinate all Engineering team member’s activities and related engineering disciplines and ensure they are produced to the correct level of quality and in accordance with the contract requirements and approved project plans. Coordinate external engineering companies for Instrument engineering activities; liaison information between engineering team members, vendors, and engineering companies. Support the technical bid evaluation, and evaluate vendor quotations and specifications. Consider QA/QC Ensure that design integrity is maintained through fabrication with correct handling of site queries and proper application of QA/QC procedures. Consider Health, Safety & Environment Ensure continuous improvements are made to all activities with the engineering department with respect to HSE.

 

Construction work & Quality Control, MC Work and Commissioning work Expediting and inspection and Performs work of Instruments System and field-installation. Executes the specific inspections on materials, equipment, and construction/installation activities on site. Issues the relevant Quality Records and, when necessary, writes and sends to QC Manager Non-conformances reports. Witness & Check cable laying and cable identification. Performs visual inspections, dimensional tests, Witness & checks rating and material for connection. Witness & check the pneumatic signal connection. Checks fiber optic cable, communication cable, etc. Witness the tests, controls, and inspections carried out. Performs tests of continuity, and insulation resistance. Performs punch-listing operations. Performs tests of functional instruments.

Participate in MC verification of equipment and packages ready for commissioning. Witness all MC Activity relating to Instrument scope joint walks down participate in punch out of offered MC Package and assist with completion of all handover documents and certification Punch out of offered MC and commissioning package. Review commissioning procedures and Perform commissioning activities during all phases to smooth and safe. Follow up punch work in the Feld and punch list document and clearance all. Check and confirm all documents & Drawings marked up with change during commissioning.

ประสบการณ์

Experiences Record

 

 

Period of Assignment         April 2022 –Present

Position:                               E&I ConstructionEngineer; Thaworn Engineering and Construction.

Project:                                 TOA Sunrise II Project

Description of Project:        TOA Sunrise II Project, TTCL Public Company Limited

Responsibilities:                  Responsible for   Manage and work sites for E&I Site construction works   coordinating site activities and assuring that all disciplines directly involved in the project are in phase with the project goals and objectives Liaise between engineers and others working on the project. Prepare and manage estimates, budgets, timetables, and resources.

 

 

Period of AssignmentSeptember 2021 – March 2022
Position:QC Engineer Instrument / Automation; SPCC Joint Venture.
Project: PTT LNG Receiving Terminal 
Description of Project:PTT LNG Nong Fab LNG Receiving Terminal Project
Responsibilities:Responsible for Reviews design, and testing documentation. Coordinates and performs inspections of raw materials and finished works, applying appropriate quality assurance testing models. Identifies the root cause of quality problems, and coordinates modifications or other corrective actions. Review, Support MC Work and Commissioning work.

 

 

Period of AssignmentApril 2021 – July 2021
Position:Project Engineer; Pro-En Technologies Ltd.
Project: The Shell Company Limited. 
Description of Project:

Countrywide Ethanol Flame Detector installation

CNS B100 Ethanol Unloading Facility Installation

CNS Barge Loading Accolade Replacement

BDN Product Pump Replacement          

Responsibilities:

Responsible for Coordinate the work of project Team, carry out site visit to confirm construction Scope of work cost estimate and budgetary and progress, join to resolve problems and issues during site survey, Review Manage monitoring & control the construction Scope of work. 

 

 

 

Period of AssignmentSeptember 2018 – January 2021
Position:E&I Construction Engineer; Thaworn Engineering and Construction.
Project:  MITR PHOL AMNATCHAROEN CO., LTD
Description of Project:Sugar Plant & Power Plant MTR Amnat- Charoen Province
Responsibilities:Responsible for Electrical& Instrument Construction Work

 

Period of AssignmentOct 2017 – Sep 2018
Position:Lead Instrument Engineer; Worley Parsons, Thailand.
Project: PTT Exploration and Production Public Company Limited. Project
Description of Project:Engineering For Arthit AWP-39 Wellhead Platform Project Basic
Responsibilities:Responsible for Lead engineering for Engineering work & design

 

 

 

 
Period of AssignmentNov 2015 – Oct 2017
Position:E&I Construction Lead Engineer: Thaworn Engineering and Construction.
Project: PTG Energy Plublic Copany Limited Project
Description of Project:PT Surin Tank Farm Surin Province
Responsibilities:

Responsible for Electrical& Instrument Construction Work, MC Work and Commissioning work

 

  
Period of AssignmentJan 2009 – Oct 2015
Position:Lead Instrument Engineer: Worley Parsons, Thailand
Project: 

CHEVRON THAILAND EXPLORATION PRODUCTION. Project

CTEP_SGWB Facilities Modification for New Platform SGWC

CTEP_Pipeline Conversion for Erawan Water Injection

CTEP_Topside Modification on ERWR and ERWB for New PL ERPLR2

CTEP_B8 32 Remote Start BC Function

B8/32 Benchamas Field Gas Lift Project. 

TANTAWAN NEW PIG INSTALLATION

 

CUEL  Limited Project

C-HESS BULAN B-WP10WHP Project

CTEP_ Cambodia Block A Detail design Project

 

PEARL ENERGY (PEARL OIL THAILAND) Ltd. Project

Mubadala_Nong Yao FEED

Pearl Provision of Periodic Engineering Support & Service.

BYA 4 Additional Flow Lines & 2 Injection Project.

Jasmine A Add New Degasser & Vent gas Scrubber Project.

Diesel Generator Dual-Fuel Upgrade Detailed Eng. Project.

WPB Modification to Increase Diesel Storage Tank Project.

6 WPC and 4BYA Additional Flow lines Project.

Sea Water Cooled Heat Exchanger Detail Design Project.

 

PTT Exploration and Production Public Company Limited. Project

PTTEP BONGKOT_ MAXIMIZING FSO2 & QP ACCOMODATION North

PTTEP ARTHIT WELLHEAD PLATFORM PHASE 1C (AWP11, 12, 13, 14), GREEN FIELD PROJECT.

  
Responsibilities:Responsible for Lead Engineering for Engineering work & design Work and Procurement support.
  
Period of AssignmentJan 2008 – Dec 2008
Position:Senior Instrument Engineer; Technip Engineering (Thailand) Ltd.
Project: 

CHEVRON THAILAND EXPLORATION PRODUCTION. Project

PTT Exploration and Production Public Company Limited. Project

  
Responsibilities:

Responsible for working on Engineering work & design  procurement support as instrument engineering

 

Period of AssignmentMay 2006 – Dec 2007
Position:Senior Project & Instrument Engineer; Smart Engineering Service Co., Ltd.
Project: 

CUEL Limited.

Pearl Jasmine B Wellhead Platform

Pearl Jasmine B 2 Platform

Pearl Jasmine C Wellhead Platform

Pearl Jasmine D Wellhead Platform

Pearl Ban Yen A Wellhead Platform

 

Alliance Refining Company Limited

Gasohol Plan Project

 

  
Responsibilities:Responsible for working on Engineering work & design procurement support as instrument engineering.
 

 

 

Period of AssignmentFeb 2004 – Mar 2006
Position:Senior Electrical & Instrument  Engineer, M+W Zander (Thai) Ltd
Project: 

BETTER PHAMA PROJECT, BETAGO

 

Description of Project:

BETAGRO PUBLIC COMPANY LIMITED 

 

Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work
  
Period of AssignmentJan 2003 – Jan 2004
Position:Sr. Project & Instrument Engineer – The Shell Company Limited. As Global Engineering Solution Co., Ltd.
Project: 

The Shell Company Limited. Thailand

Growdao Chemical Vietnam Project

Bitumen Plan Laos Project 

The Shell  Chong- nonsi   Oil Tank alarm Upgrade

The Shell Chong- nonsi  PMB Plant Upgrade

  
Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work
  
Period of AssignmentJuly 2000 – April 2003
Position:

Instrument Engineer, Toyo-Thai Corporation, Ltd.

 

Project: 

TLP Cogeneration Co., Ltd.

117 MW TLP COGEN. RAYONG POWER PLANT PROJECT

 

GE Toshiba Silicones (Thailand) Limited

NEW SILICONES FINISHING PLANT PROJECT

 

Eastern Chemical Co., Ltd.

 

ECC EXPANSION 120KL PROJECT

 

Responsibilities:Responsible for working Electrical& Instrument Construction Work, MC Work and Commissioning work
  
Period of AssignmentFeb 1998 – Apr 2000                                                              
Position:Maintenance Manager, MBK Laundry Co., Ltd.
Responsibilities:

Management & control to maintenance and repair automatic Laundry machines factory utility equipment, air compressor, Steam Boiler, Waste water Treatment and factory electrical power.

 

  
Period of AssignmentOctober 1995 – Jan 1998
Position:E&I Engineer, German-Thai Boiler Engineering Cooperation Ltd
Responsibilities:

Engineering design work Site construction work Installation, Loop test Function test and Pre-commissioning & Commission work

 

 

 

 

Training Record

 

  • Boiler Control& Maintenance Courses, Technology Department of Industrial Work
  • INTOOL Program, Intergraph Corporation
  • DCS Basic Design, Yogokawa Thailand  
  • Weighing Measuring Instrument in Industrial, Mettler-Toledo (Thailand) Co., Ltd.   
  • Power plant Operation & Communication system ECGO, TTL Thailand Co., Ltd
  • Gas turbine & Steam turbine control systems, GE, Altom, ECGO
  • Basic Offshore Safety Training, Technical Petroleum Training Institute.
  • ISO 9001:2000 Awareness SGS (Thailand Ltd.
  • Industrial Pneumatic System Maintenance, Technical Training Centre Rajamangala Institute of technology 

Computer Software/Programs

 

  • Engineering and Design Programs
  • Instrucal for instrument
  • Intools Program
    • Office Program
  • Microsoft Office Excel
  • Microsoft Office PowerPoint
  • Microsoft Office Word
  • Microsoft Office Project
  • Microsoft Office Visio
    • Multimedia Program
  • Macromedia Author war
  

 

การศึกษา

Education: Bachelor Degree of Instrumentation Engineering from King Mongkut's Institute of Technology Ladkrabang, Thailand, Year 1995.
 

Thai – Mother Tongue

English - Good

มืออาชีพที่แข่งขันกับ Supoj

ผู้เชี่ยวชาญจากภาค วิศวกรรมศาสตร์/สถาปัตยกรรม เดียวกันกับ Supoj Chawna

ผู้เชี่ยวชาญจากภาคต่างๆใกล้ Bangkok, กรุงเทพฯ

หางานใกล้ Bangkok, กรุงเทพฯ


  • Mid-West Dental Group.,LTD. เขตบางกะปิ, ประเทศไทย เต็มเวลา

    -ออกแบบ และเขียนแบบผลิตภัณฑ์ โดยใช้โปรแกรม Solid Works-วิเคราะห์ และเลือกวัสดุที่จะใช้ทําผลิตภัณฑ์ ...

  • บริษัท ไทยออยล์ เอนเนอร์ยี เซอร์วิส จำกัด

    Instrument Technician

    พบใน: beBee S2 TH - 1 สัปดาห์ที่แล้ว


    บริษัท ไทยออยล์ เอนเนอร์ยี เซอร์วิส จำกัด เขตจตุจักร, ประเทศไทย เต็มเวลา

    ตรวจสอบดูแลอุปกรณ์และระบบ QMI ในเครือไทยออยล์ รวมถึงอุปกรณ์ในระบบ Hydrocarbon ให้สามารถทํางานได้อย่างเต็มศักยภาพ ปลอดภัย ...

  • ochaya co.,ltd

    Construction Designer

    พบใน: beBee S2 TH - 3 วันที่แล้ว


    ochaya co.,ltd เขตประเวศ, ประเทศไทย เต็มเวลา

    ความรับผิดชอบหลัก (Key Responsibilities) หน้าที่หลัก/กิจกรรมหลัก (Key Responsibilities and Activities)วัตถุประสงค์หลักของงาน (Key Objectives)ตัวชี้วัดผลงานของตําแหน่งงาน (Performance Indicators) งานวัดพื้นที่ -เมื่อได้รับมอบหมายหน้าที่ให้รับผิดชอบงานออกแบบ ต้องหาข้อมูลของพื้นที่ ...